LCA logoLowcountry Aerospace & ComplianceAOG · Maintenance · Compliance Beta
Planning · Forecasting

The Revenue Trinity: when to ground an aircraft

Every day an aircraft spends in maintenance is a day it can't fly. For a charter or management company that's lost revenue; for a corporate flight department it's the principal's trip that has to go another way. Maintenance can't be avoided, but when it happens is almost entirely a planning decision.

The Revenue Trinity is three rules that work together. Any one on its own helps; all three together change how the year looks.

1. Ground less often

Instead of taking an aircraft down ten times a year for short events, consolidate inspections and due items into two or three planned work orders. Three planned 20-day groundings beat ten 6-day groundings: each event may cost a little more, but the aircraft gets far more usable days between them, and there are fewer inductions, repositioning legs and schedule disruptions.

Your maintenance tracking program makes this possible. Look far enough ahead to see which tasks can be pulled forward and bundled with the next major inspection.

2. Ground during slow months

Protect the peak periods without exception: summer, Thanksgiving, Christmas and the major holidays. Aim downtime at the historically slow windows instead.

Protect (don't ground)Target for maintenance
SummerSeptember
ThanksgivingOctober
ChristmasFebruary
Major holidaysApril and early May

For a corporate flight department, substitute the principals' own busy seasons. The idea is the same: losing a September week is a good trade if it keeps the aircraft available through Christmas.

3. Never overlap

Don't ground two aircraft of the same type at the same time unless something truly unforeseen forces it. If one aircraft is down September 15–25 and another of the same type is planned for September 17–29, fix it now, not when the schedulers discover it. Overlap is almost always a communication failure, and it's entirely preventable.

Make it a calendar habit

Forecast the next calendar year twice a year. Start by July 1, and have every planned maintenance event for next year on the calendar by September 30. That gives Sales or the scheduler a full year of reliable availability to plan against, and it gives your shops and vendors time to hold the slots you need.

The Trinity at a glance: ground less often, ground in slow months, never overlap, and forecast the whole next year by the end of September.

General guidance for orientation only. Your MEL, approved manuals and the regulations govern; confirm against them before acting.

Go deeper

The Maintenance Control & AOG Manager Manual

83 pages on how a maintenance control desk should run, for any Part 91 or 135 operator and any software. Or get the free one-page quick reference.

See the manualFree quick reference